A new $9.5 million bridge is being built over the channel. The bridge is supposed to end periodic closures due to flash flooding, rain storms and wind.
A new $9.5 million bridge is being built over the channel. The bridge is supposed to end periodic closures due to flash flooding, rain storms and wind.