Crews are working around the clock to fill in the hole, which measure 25 feet across and about 6 feet deep. Crews are also replacing the pipe, which is located about 20 feet deep.
The entire 215 remains closed for about a 2-mile stretch near Los Alamos Road, not far from the Interstate 15-215 split.
The south side is expected to reopen Sunday evening, and the north side is expected to reopen late Tuesday evening.
Traffic is being rerouted around the site.
MORE LOCAL HEADLINES FROM INLAND EMPIRE
USEFUL LINKS:
SEND TIP || REPORT TYPO || TWEET @abc7 || WIDGET