The eastbound lanes of the 60 Freeway were shutdown between Ontario and Riverside starting at 10 p.m. Friday. The lanes were scheduled to reopen Monday at 5 a.m.
The closures were part a months-long project to resurface the road. Caltrans hoped to finish the freeway project by Thanksgiving.