• BREAKING NEWS ABC shows live and on-demand -- Download the WATCH ABC app!

Month-long Coldwater Canyon Avenue partial closure announced

March 4, 2013 12:00:00 AM PST
Coldwater Canyon Avenue will be partially closed between Ventura Boulevard and Mulholland Drive from March 23 to April 25.

Coldwater Canyon Ave. will be closed from 8:30 a.m. to 7 p.m. Monday through Friday during the month, and Saturdays from 8:30 a.m. to 6 p.m., while city crews replace a 60-inch water pipeline.

During non-working hours, Coldwater Canyon Avenue will have one lane open in each direction.

Crews will replace a 99-year-old pipe. About 1,300 vehicles drive Coldwater Canyon every hour during peak travel times.


Load Comments