Month-long Coldwater Canyon Avenue partial closure announced

STUDIO CITY, LOS ANGELES

Coldwater Canyon Ave. will be closed from 8:30 a.m. to 7 p.m. Monday through Friday during the month, and Saturdays from 8:30 a.m. to 6 p.m., while city crews replace a 60-inch water pipeline.

During non-working hours, Coldwater Canyon Avenue will have one lane open in each direction.

Crews will replace a 99-year-old pipe. About 1,300 vehicles drive Coldwater Canyon every hour during peak travel times.

Copyright © 2024 KABC Television, LLC. All rights reserved.